Frequently Asked Questions
What are post-harvest losses, and how can grain processing equipment help reduce them?
Post-harvest losses refer to grain losses occurring from harvest to consumption due to improper handling, outdated equipment, or poor storage conditions. According to statistics, global post-harvest grain losses range from 10–20%.
Modern grain processing equipment reduces losses by:
- Efficient cleaning equipment: Removing impurities to minimize waste in subsequent stages.
- Precise grading equipment: Sorting by size and density to ensure processing consistency.
- Temperature-controlled drying equipment: Replacing natural sun drying to prevent mold and pests.
- Airtight storage systems: Protecting against moisture, rodents, and insects to extend shelf life.
What is grain cleaning, and why is it necessary before processing?
Grain cleaning refers to removing various impurities from raw grains, including organic impurities (straw, weed seeds, moldy kernels), inorganic impurities (sand, stones, dirt), and foreign grains. The necessity of cleaning includes:
- Ensuring product quality: Impurities affect the purity, color, and taste of final products.
- Protecting processing equipment: Hard objects like stones can damage key components such as rollers and screens.
- Ensuring food safety: Metal contaminants and moldy kernels may pose health risks.
- Improving yield: Cleaned grains result in higher milling efficiency and finished product rates.
A complete cleaning process typically includes: pre-cleaner → vibrating screen → destoner → magnetic separator → gravity separator.
How do I determine the capacity I need for my processing line?
Capacity determination should consider:
- Raw material availability: Daily processing volume should match your supply capacity.
- Market demand: Estimate daily sales; it's advisable to have capacity slightly above current demand to accommodate growth.
- Operating shifts: Single, double, or triple shifts affect daily output.
- Product type: Different grains (corn, wheat, pulses) process at different rates.
Typical capacities: small-scale lines 10–50 tons/day, medium-scale 50–200 tons/day, large-scale 200–1,000 tons/day. If unsure, provide your raw material type and target output, and our engineers will recommend the appropriate configuration.
What are the main process flows in grain processing?
Modern grain processing typically includes the following core processes:
Stage | Main Equipment | Function |
Receiving & Storage | Truck scale, bucket elevator, silo | Raw material intake, weighing, temporary storage |
Cleaning | Vibrating screen, destoner, magnetic separator | Removing impurities, metals, stones |
Sieving & Grading | Plansifter, gravity separator | Separating finished products by particle size |
Packaging | Packaging machine, bag closer | Metering, bagging, sealing of finished products |
Can the same processing line handle different types of grains?
Yes, but with considerations:
- Corn vs. wheat: Different processes—corn requires degermination, wheat requires conditioning; adjustable screen sizes and roller gaps are recommended.
- Pulses vs. cereals: Pulses are harder with irregular shapes; air flow and screen openings need adjustment for cleaning and grading stages.
- Changeover cleaning: When switching grain types, thoroughly clean equipment internals to prevent cross-contamination.
If you plan to process multiple grain types, inform our engineers during purchase, and we will recommend a more compatible configuration.
What factory area and ceiling height are required?
Space requirements depend on equipment configuration and capacity:
- Small-scale (10–30 tons/day) : 100–200㎡, height ≥6 meters.
- Medium-scale (50–100 tons/day) : 300–500㎡, height ≥8 meters.
- Large-scale (200+ tons/day) : 800–1,200㎡, height ≥10 meters.
If ceiling height is limited, horizontal layout (single-floor) designs are available. We provide floor plans and 3D renderings for your reference.
What should I do if screens frequently clog?
Common causes and solutions for screen clogging:
- Cause 1: Material moisture too high → Check moisture before processing; add drying or conditioning if needed.
- Cause 2: Insufficient screen tension → Regularly check screen tension; loose screens cannot vibrate effectively.
- Cause 3: Excessive feed rate → Adjust feeder for uniform feeding.
- Cause 4: Worn cleaning balls → Inspect and replace rubber balls inside screen box.
- Cause 5: Incorrect screen mesh selection → Choose appropriate aperture size based on material particle size.
Daily maintenance: clean screen surfaces after each shift; weekly: check for screen damage; monthly: inspect cleaning ball condition.
How can I reduce excessive noise during operation?
Noise sources and mitigation measures:
- High-pressure fans (up to 110dB): Install silencers at outlets or house fans in separate soundproof rooms
- Air compressors and blowers: Place in dedicated soundproof rooms isolated from main workshop
- Roller mill vibration: Check roller parallelism, bearing wear, and anchor bolt tightness
- Piping systems: Check sealing at air duct connections to avoid whistling
Install sound-absorbing materials (e.g., polyester fiber panels) on interior walls, and use vibration dampers between equipment and floor. After treatment, indoor noise can be reduced to approximately 70–75dB.
How are equipment packaged and shipped?
We use standard packaging suitable for international sea/air freight:
- Main equipment: Secured with fumigation-free wooden crates or steel frames, wrapped with moisture-proof film
- Motors and precision components: Individually packaged with desiccants for moisture and shock protection
- Screens and wear parts: Separately boxed with clear labeling
- Control systems: Anti-static packaging with “Handle with Care” labeling
Shipping is typically by sea (full container or LCL); air freight is available for small emergency spare parts. We provide detailed packing lists, equipment lists, and customs clearance documents (commercial invoice, certificate of origin, packing list) to ensure smooth clearance at the destination port.
How is installation and commissioning arranged after equipment arrives?
We offer the following installation support options:
- On-site installation guidance (recommended): Our technicians can travel to your facility to guide installation, commissioning, trial runs, and operator training. Typically requires customer to cover round-trip airfare, accommodation, and local transportation.
- Remote video guidance: For simple lines or facilities with experienced staff, real-time video guidance (WhatsApp/Skype) is available along with drawings and instructional videos.
- Local third-party installation: In some regions, we can recommend local installation service partners (additional cost).
Installation and commissioning typically take 5–15 days, depending on line scale and complexity. We recommend preparing foundations, power, water, and other infrastructure before equipment arrival.
What power supply specifications are required for the equipment?
We can customize according to your regional electrical standards:
- Voltage: 380V/415V 50Hz (suitable for most of Asia, Africa, Europe); 220V/240V 60Hz (suitable for parts of the Americas)
- Total power: Ranges from tens to hundreds of kilowatts depending on line scale; we provide detailed power consumption lists
- Control panel: Standard PLC control panel with one-touch start/stop, fault alarms, current monitoring, and other functions
We recommend completing power connection before equipment arrival, and installing voltage regulators or generators to handle fluctuations (especially in areas with unstable grid supply).
What are the payment terms?
We typically offer the following payment terms:
- Standard terms: 30% advance payment (upon contract signing), 70% balance (before shipment or against copy of bill of lading)
- Letter of Credit (L/C) : Sight L/C accepted; specific terms negotiable
- Small orders: 100% prepayment (for spare parts or small items)
All payments are made through corporate bank accounts to ensure transaction security. We provide pro-forma invoices (PI) and contracts for your internal approval.
What is the warranty period? How can I obtain after-sales service?
- Warranty period: 12 months from equipment delivery or 12 months from commissioning (whichever comes first). Wear parts (screens, belts, bearings, etc.) are not covered under warranty.
- After-sales service scope:
- During warranty: free repair or replacement for quality-related defects
- Lifetime technical support: contact our engineers for assistance anytime
- Emergency spare parts can be shipped within 24 hours
- During warranty: free repair or replacement for quality-related defects
Contact us: Send fault descriptions and photos/videos via WhatsApp/WeChat/email, and our engineers will respond within 24 hours with solutions.
We prioritize your convenience by providing tailored solutions and expert support at every step.
Free solution proposals
You Will Receive:
One-on-one consultation with a product advisor
Detailed assistance from our expert team
Free solution proposals
Email:info@mission-mac.com
WhatsApp:+8613213176932
Tel:+86-13213176932
Add: #503, Building #3, Tianjian Lake Intelligent IoT Industrial Park, Zhengzhou, Henan
We Welcome Your Inquiries
Please provide a brief description of your needs or questions below, and our team will get back to you within two business days.



